Men of Stone Progress

We now have all of the first five stones, identified retrieved, designed, cut and drilled. Stone number one, The Gneiss One, is installed in a custom pool in Simon’s yard. Stones four and five are now in Simon’s driveway.

Stone number 4 moving

Moving #4 using the MDX drag method.
Not recommended.

Stones two and three will be recovered from the fabricator on Friday 5/26/2006. We are working on designing and building a prefabricated basin.